Permit Fees - 2% State of Virginia Levy is added to the total price of each permit. About Refunds

Residential:

Commercial:

Residential: Building Permit Fees, R-3, R-4, & R5
New Dwellings (Use Group R)
  • Includes: Living spaces, garages (attached or detached), carports, porches, decks, structural patios, basement (finished or unfinished), finished habitable attic space.
  • NOTE: No charge for unfinished attic space, crawlspaces, entry porches 25 sq. ft. or less, non-structural patios.
$ .15 / sq. ft.
$ 100.00 minimum fee
Additions to Dwellings (Use Group R)
  • Includes: Living spaces, garages (attached or detached) carports, enclosed porches, sunrooms, pool houses, any enclosed habitable or occupied space.
$ .15 / sq. ft.
$ 75.00 minimum fee
New Accessory Structures
  • Includes: Decks, detached sheds (exceeding 150 sq. ft.), structural slabs, patios, gazebos, basements, areaways, retaining walls (4 ft. or higher), chimneys and fireplaces and any accessory structure not exempt by VUSBC.
$ .15 / sq. ft.
$ 50.00 minimum fee
Alterations to Dwellings (Use Groups R3, R4, R5)
  • Includes: Living space, garages (attached or detached), carports, basements, habitable attics, porches, decks, any habitable or occupied space.
$ .15 / sq. ft.
$ 75.00 minimum fee
Residential: Electrical Permit Fees, R-3 and R-4
New Installations:
100-200 AMP Service $ 50.00
201-400 AMP Service $ 70.00
401-600 AMP Service $ 80.00
Upgrade Installations:
Upgrade Service Only $ 50.00
Upgrade Services with RewireSame as New
Temporary Service on Pole $ 30.00
Permanent Service on PoleSame as New
Limited Electrical Work (w/ Building Permit):
Base Fee $ 30.00
Fixture Outlets$ 1.00 / ea.
Miscellaneous:
Miscellaneous Electrical Work$ 30.00
Swimming Pool (In-Ground) $ 50.00

NOTE: Areas not covered by this fee schedule will be charged at 0.5% of the contract cost not to exceed $ 250.00.

Residential: Mechanical Permit Fees, R-3 and R-4
All Heating Systems (Electric, Gas, Fuel, Oil, Wood, Coal, Solar, etc.):
Equipment and Duct Work $ 50.00 / system
Equipment Only $ 40.00 / unit
Duct Work Only (w/ Building Permit) $ 30.00
Appliance Installation with LPG or Natural Gas:
Gas Service $ 40.00
Units or Appliances$ 5.00 / ea.
Tanks:
Underground LP Gas Tanks (Any Size) $ 35.00 / tank
Above-ground LP Gas Tanks (Any Size) $ 35.00 / tank
Underground Fuel Oil Tanks (Any Size) $ 35.00 / tank
Above-ground Fuel Oil Tanks (Any Size) $ 35.00 / tank
Remove Underground Tank (Any Size) $ 35.00 / tank
Additional Removal (Any Size) $ 10.00 / tank
Minimum Permit (Tank Only) $ 35.00

NOTE: Areas not covered by this fee schedule will be charged at 0.5% of the contract cost not to exceed $ 250.00.

Residential: Plumbing Permit Fees, R-3 and R-4
New Construction:
Base Fee $ 40.00
Bathrooms $ 10.00 / ea.
Ground-Works $ 10.00
Water and/or Sewer Lateral (without New Construction) $ 50.00
<
Well (Includes Electrical Permit and requires Health Dept. approval) $ 40.00
With New Construction $ 20.00
Fire Suppression (NFPA 13R & 13D)
Base Fee
Plus - Tanks and/or Pumps
           Sprinkler Heads

$ 50.00
$ 25.00
.50 each
Misc Plumbing Work :
Limited Plumbing Work (With Building Permit$ 40.00
Base Fee$ 10.00
Plumbing Fixtures$ 5.00 / ea.
Replacing or Repairing Fixtures or Electric Water HeatersNo Charge

NOTE: Areas not covered by this fee schedule will be charged at 0.5% of the contract cost not to exceed $ 250.00.

Industrialized Buildings: Modular Homes (Sealed by DHCD)
Third Party Inspection Seal $ 100.00
Unfinished Areas (Exclude Unfinished Attics) $ .15 / sq. ft.
Finished Areas (All Habitable Space) $ .15 / sq. ft.
Decks or Porches $ .15 / sq. ft.
Electrical Service $ 50.00
Plumbing $ 40.00
Mechanical (Heating and/or A/C) * $ 50.00
Gas Service $ 40.00
Well $ 20.00
For Additions or AlterationsSee Residential Building Permit Fees

* When installed on site and with active building permit.

NOTE: No charge for unfinished attic space, crawlspaces, entry porches 25 sq. ft. or less, or non-structural patios.

Manufactured Home: Mobile Home (Sealed by HUD)
Single Wide (One Section)
  • Includes: Electrical service, plumbing connection
$ 75.00
Double Wide (More Than One Section)
  • Includes: Electrical service, plumbing connection
$ 100.00
Extra Fees:
Gas Service $ 40.00
Mechanical (Heating and/or AC) * $50.00
Well $ 20.00
For Additions or AlterationsSee Residential Building Permit Fees

* When installed on site and with active building permit.

Manufactured Home: Transportable in one or more sections; is 8 body feet or more in width and 40 body feet or more in length in the traveling mode, or is 320 or more square feet when erected on site.

NOTE: No charge for crawlspaces, entry porches 9 sq. ft. or less, or non-structural patios.

Miscellaneous Residential Permit Fees
Demolition $ 50.00
Temporary Certificate of Occupancy (60 Days) $ 50.00
Re-Inspection $ 50.00
Renewal of Permit $ 50.00
Septic System Application Fee (After 11/19/91)$ 50.00
Residential Towers / Antennas & Wind Turbines $ 50.00
Administrative Fee $ 20.00 minimum
Hourly Rate for Research (FOIA)$ 30.00 / hr.
Plan Review Fee (Optional as Needed) $ 50.00
Alarm System $ 40.00
Returned Checks "UCF" $ 35.00
Swimming Pool (Private Use Only):
In-ground Pool (Add Electrical Permit) $ 75.00
Above-ground Pool (Includes Electrical Permit) $ 40.00
Zoning Residential Permit:
New Dwelling and Additions to Dwelling (Anything Detached Over 150 sq. ft.) $ 100.00
Detached Structures (Under 150 sq. ft.) $ 35.00
Inspection Prior to Issuance of Permit$ 50.00
Appeals Board Application Fee $ 125.00

NOTE: Areas not covered by this fee schedule will be charged at 0.5% of the contract cost not to exceed $ 250.00.

Commercial: Building Permit Fees, All Use Groups Except R-3 and R-4
Commercial, Industrial, Institutional:
New Construction $ .20 / sq. ft.
Additions $ .20 / sq. ft.
Alterations1% of Cost
Minimum Permit Fee$ 75.00
Tenant Fit-Out $ 100.00
Change of Use $100.00
Government Buildings, Schools, Churches:
New Construction $ .10 / sq. ft.
Additions $ .10 / sq. ft.
Alterations1% of Cost
Minimum Permit Fee$ 75.00

Alteration permit fee not to exceed $750.00 per building.

Cost = fair market price on contract price on construction cost only.

Commercial: Electrical Permit Fees, All Use Groups Except R-3 and R-4
New Installation (Base Fee):
0-400 AMP Service $ 50.00
401-800 AMP Service $ 70.00
801-1200 AMP Service $ 80.00
1201& Greater Services $ 100.00
Service Upgrade Refer to New Services Fees
Add miscellaneous fees (below) to base fee (above) for total permit cost. Minimum Permit Fee is $50.00
Receptacles, Lights, and Switches$ .25 ea.
Circuits$ 1.00 ea.
Motors$ 10.00 ea.
Electric Baseboard Units $ 10.00 ea.
Electric Water Heater$ 15.00 ea.
Refrigeration / Freezer Units$ 15.00 ea.
A/C and Heating Units$ 15.00 ea.
Transformers$ 15.00 ea.
Sub-Panels $ 25.00 ea.
Generators $ 25.00 ea.
Swimming Pool (Includes Equipment) $ 100.00 / pool
Signs & Billboards $ 50.00 / sign
Temporary Pole Service (For Construction) $ 30.00
Permanent Pole ServiceSee New Installation
Outside Pole Lights (Includes Footer Inspection) $ 50.00 per pole
Plug-In Type Appliances and EquipmentNo Charge
Special Inspection $ 50.00
Fire Alarm System $50.00
Pull Stations$ 3.00 / ea.

Installations not referenced above will be charged 1% of the cost, not to exceed $750.00.

Cost = fair market price or contract price on the electrical cost only.

Commercial: Mechanical Permit Fees, All Use Groups Except Use "R-5"
Mechanical Permit (New Installations or Replacements):
Heating or Cooling Systems
  • Includes: Heat pumps, A/C units, refrigeration units, chillers, furnaces, boilers, solar, geo-thermal and required duct work and exhaust venting.
$ 75.00 / ea.
Heating or Cooling Units
  • Includes: Small appliances such as: ceiling or wall heaters, pre-fab fireplaces, gas logs, log lighters, wood or pellet stoves, pool heaters, commercial dryers, and required exhaust venting.
$ 50.00 / ea.
Gas Service $ 40.00
Add Per Connection$ 5.00 / ea.
Medical Gas Service $ 40.00 per type
Tanks (Install or Remove):
Above and Below Ground $ 50.00
Each Additional Tank$ 10.00
Commercial Kitchen Hood System:
Minimum Permit Fee $50.00
Hood $ 50.00 / ea.
Fire Suppression System $ 50.00 / ea.
Fire Suppression (NFPA 13, 13R, 13D):
Base Fee $100.00
Tanks and/or Pumps $ 50.00
Sprinkler Heads$ .50 / ea.
Elevators, Escalators, Dumbwaiters, Hoist, Cranes$ 75.00

Installations not referenced above will be charged 1% of the cost, not to exceed $750.00.

Cost = fair market price or contract price on the mechanical cost only.

Commercial: Plumbing Permit Fees, All Use Groups Except Use "R-5"
Plumbing Permit (Base Fee for New Construction and Additions)
One Story Building $ 50.00
Two or More Floors $ 75.00
Add miscellaneous fees (below) to base fee (above) for total permit cost.
Minimum Permit Fee $50.00
Water Lateral (w/o New Construction) $ 50.00
Sewer Lateral (w/o New Construction) $ 50.00
Fixtures, Appliances, Equipment, Devices, or Drain Which Connect to Water Supply or Waste Lines$ 5.00 / ea.
Well (Includes Electrical Permit and requires Health Dept.) $ 40.00
Well with New Construction$20.00
Special Inspection $ 50.00
Sewer Pump Station (without building)$50.00 each
Solar Panels (for heat, boilers, hot water, or etc.) $ 50.00

Installations not referenced above will be charged 1% of the cost, not to exceed $750.00.

Cost = fair market price or contract price on the plumbing cost only.

Commercial: Miscellaneous Permit Fees, All Use Groups Except Use "R-5"
Alarm System$ 50.00
Annual Building Permit (Approved by Building Code Official)$ 100.00
Asbestos Removal$50.00 / building
Certificate of Occupancy & Use
    Existing Building or Structure
    Temporary Occupancy Permit (30 Days)

$100.00
$100.00
Demolition$ 75.00
Inspection Prior to Issuance of Permit$ 50.00
Plans Review (over 5,000 sq. ft.)(Optional of additions and alterations)$ 5 per sheet
Re-Inspection$ 50.00
Renewal of Permit$ 50.00
Re-Roof$ 75.00 per building
Re-Siding$ 75.00 per building
Returned Checks "UCF"$ 35.00
Signs and Billboards (Plus electrical fees)$ 50.00 per sign
Special Inspection Request$ 50.00
Swimming Pool$ 100.00 per pool
Tents (over 900 sq. ft.)$ 75.00
Temporary Construction Trailer (Plus electrical service fees)$ 75.00 per trailer
Temporary Sales Trailer (single or double wide units)(Plus electrical service fees)$ 75.00 per trailer
Towers, Antennas, Wind Turbines, & etc.
New Communication Equipment Only (Plus square footage or equipment building & electrical fees)
$ 100.00 per structure
$75.00
Zoning Permit (Commercial, industrial, & etc.) $200.00